Skip to main content

mo machha pokhari yojana | Alwaysgainknoledge

Odisha Matsya Pokhari Yojana 2021:To create job opportunities and additional water bodies for intensive aquaculture in inland culture through excavation of new tank/pond in the state of Odisha , Odisha CM has launched Odisha Matsya Pokhari Yojana 2021.


Objectives:
  • To create additional water bodies for intensive aquaculture in inland sector through excavation of new tanks/ ponds in the State of Odisha.
  • To ensure income generation and employment creation through promotion of freshwater aquaculture.

Eligibility criteria for

 

  • Must be a permanent resident of Odisha and must possess identity and residential proof including Aadhaar Card.
  • Must have a bank account in his/ her name in the State of Odisha.
  • Must have requisite land free from all encumbrances (Documentary evidence in support of the land needs to be produced by the beneficiary).
  • The minimum of 0.2 ha. and the maximum of 2.00 ha. excavated area having a minimum water depth of 6 feet shall be considered for subsidy.
  • If a beneficiary has availed subsidy earlier for excavation of ponds for pisciculture development under different schemes of Government of India and State Government, for less than 2 ha., he/ she shall also be eligible to avail further subsidy under this scheme. However in such cases, the subsidy shall be limited to a maximum of 2 ha.; which will include the area covered 
Documents require to get this Scheme

  1. Land Document
  2. Aadhaar Card
  3. Passbook Photograph (1st Page)
  4. Caste Certificate for Affirmative Action
Application Form:


Department's Support for Matsya Pokhari Yojana 2021:

  • Training of farmers will be organized at Regional/ District/ Block level.
  • The concerned AFO of the block will guide the farmers in field and will give lay out for excavation of new tanks and provide all technical support for pisciculture.
  • Assistance in marketing of fish.
Process for Providing Subsidy under this (Matsya Pokhari Yojana) Scheme:

  • Identification of beneficiary shall be made with Aadhaar linking at the time of submission of application. The DFO must ensure the Aadhaar No. of the beneficiaries and the land record to prevent multiple benefits.
  • Preference shall be given to ST/ SC applicants in selection of beneficiaries.
  • On receipt of application from the applicant, the AFO of the block shall visit the site and submit the survey and technical feasibility report, land records and other documents to the DFO within 15 days.
  • The AFO shall take around 5 Geo tagged photographs of the site where the fish pond is proposed for excavation and submit a copy of the pre project photos to the DFO, along with other documents.
  • On receipt of application along with documents from the AFO, the DFO shall convene the District Level Screening Committee (DLSC) meeting under chairmanship of the Collector for approval of the list of eligible beneficiaries.
  • The DFO shall issue a Go-Ahead letter and DPR to the selected beneficiaries to take up excavation work of tanks.
  • The Assistant Fisheries Officer of the concerned block shall visit the site and guide the farmers from time to time at the time of project construction and render technical support during culture period.
  • During construction of the project, the beneficiary shall submit the RI verification report of the land on which the tank is being excavated.
  • Geo tagged photograph of the project shall be taken by AFO along with the beneficiary before excavation, during excavation and after completion of the project.
  • The beneficiary shall inform the AFO about completion of the project.
  • The AFO shall make field visit within 15 days and submit the completion certificate to the DFO along with all photographs.
  • Physical verification shall be conducted by the District Level Committee on completion of the project and recommend for release of subsidy. The District level Committee shall consist of DFO, Addl. FO/ AFO (Hqrs.), AFO of the concerned block and the representative of Block Level Officer of CDAO. The Committee shall physically verify all the completed projects.
  • The Zonal Deputy Director of Fisheries shall visit at least 30% of the completed cases.
  • 50% subsidy of the eligible subsidy shall be released by the DFO after completion of the excavation as per specification and after verification of the committee.
  • The remaining 50% of the subsidy shall be released to the beneficiary after stocking of fingerlings and on receipt of necessary certificate from the AFO on stocking of fingerlings.
  • The beneficiary shall submit the GST bills/ receipts towards procurements of inputs.
  • The back ended subsidy shall be released directly to the beneficiary account on completion of the project through DBT/ RTGS/NEFT in the Aadhaar linked Bank Account of the beneficiary.
  • Horticulture activity on the pond embankment shall be encouraged and taken up by the fish farmers at their own cost for additional income.
  • Sign Board must be displayed on the embankment of pond with details of scheme, funding, subsidy, area, name & address of beneficiary, year of implementation etc.
Outlay(Expenditure),unitof this Scheme:

Total outlay of Machha Chasa Pain Nua Pokhari Khola Yojana is Rs. 70 crore.

Unit Cost & Subsidy Assistance

The following tank model / models shall be executed by the beneficiary:-

A) Capital Cost:

Specification of Tank / PondUnit Cost (Rs.)Subsidy Assistance (Rs.)
General (40%)
Subsidy Assistance (Rs.)
SC / ST / Women (50%)
New tank of excavated area of 0.20 ha. having 6 Feet depth1,40,00056,00070,000
New tank of excavated area of 0.30 ha. having 6 Feet depth210,00084,000105,000
New tank of excavated area of 0.40 ha. having 6 Feet depth280,000112,000140,000
New tank of excavated area of 0.50 ha. having 6 Feet depth350000140000175000
New tank of excavated area of 0.60 ha. having 6 Feet depth420,000168,000210,000
New tank of excavated area of 0.70 ha. having 6 Feet depth490,000196,000245,000
New tank of excavated area of 0.80 ha. having 6 Feet depth560,000224,000280,000
New tank of excavated area of 0.90 ha. having 6 Feet depth630000252,000315,000
New tank of excavated area of 1.00 ha. having 6 Feet depth700,000280,000350,000
Matsya Pokhari Yojna Capital Cost

B) Input Costs

Specification of Tank / PondUnit Cost (Rs.)Subsidy Assistance (Rs.)
General (40%)
Subsidy Assistance (Rs.)
SC / ST / Women (50%)
Input cost for one crop cycle (seed, feed, fertilizer, medicine etc.) for 1.00 ha. water area (Annexure-I)Rs. 1,50,000Rs. 60,000Rs. 75,000
Matsya Pokhari Yojana Input Cost

The total unit cost for 1 ha. tank comes around Rs. 8,50,000. Total subsidy assistance for 1 ha. tank for general category is around Rs. 3,40,000 while total subsidy assistance for SC / ST / women is around Rs. 4,25,000. It is important to note that 40% subsidy shall be provided to the General category and 50% to SC/ ST/ Woman categories of beneficiaries as per Matsya Pokhari Yojana.

The detailed specification of the input cost components are placed here:-

ItemsQuantity / HaRate (Rs.)Amount (Rs.)
Lime (Kg)400124800
Organic manure like Cow dung (Kg.)100000.55000
Urea (Kg.)3012360
Super Phosphate (Kg.)2012240
Fish Fingerling (No.)6000212000
Feed (1: 1.0) (Kg.)500022110000
Medicine L.SL.S8000
Labour ExpensesL.S5000
Miscellaneous expensesL.S4600
TotalRs. 1,50,000
Input Cost Distribution in Matsya Pokhari Yojana.

District Wise Target under Odisha Matsya Pokhari Yojana for FY 2021-22:

DistrictTarget (Ha.)
Cuttack35
Jajpur35
Jagatsinghpur55
Kendrapada80
Puri120
Khordha40
Nayagarh50
Balasore200
Bhadrak110
Mayurbhanj100
Ganjam50
Gajapati25
Kandhamal10
Kalahandi80
Nuapada30
Rayagada40
Koraput40
Nawarangpur40
Malkangiri70
Sambalpur70
Jharsuguda25
Bargarh55
Bolangir55
Boudh20
Sonepur35
Keonjhar35
Sundargarh30
Dhenkanal40
Deogarh35
Angul40
Total1650
Reference PDF:


For more details on Scheme,visit office all website:http://www.fardodisha.gov.in


Comments

Popular posts from this blog

what are the possible causes of cable faults?

नमस्कार मित्रों,आज मैने HT AB CAble फॉल्ट कियुं होता है उसिके बारे में चर्चा करूंगा।    आप सभी जानते है कि एचटी एबीसी साइट इंजीनियर के लिए सरदर्दी बन जाती है। जैसे ही लाइन चार्ज करते है कुछ मिनटों या महीनों के बाद फॉल्ट आना पैदा करदेता है।   बहुत सारे इंजीनियर तो बोलना शुरू कर देते है कि खराब इनसुलेशन की बजहा से ऐसे फॉल्ट होता है।  बहुत सारे रिसर्च और अनुभव के बाद  बाद में यही नतीजे में पहुंचा कि जो इस्प्रकर की। 1) अन लोडिंग,स्टोरेज और हैंडलिंग सही से होना चाहिए। 2) टर्मिनेशन किट या ज्वाइंटिंग सही से होना चाहिए। 3) एआर्थिंग सही से होनी चाहिए जैसे कि टर्मिनल की latches  एआर्थिग  जरूर करना होता है। एक चीज ध्यान देना कि मैसेंजर तार को भी दोनों साइड में एर्थिंग करने की। ऐसे तो मैने ए भी कहूंगा कि  हर एक खंबे में मैसेंजर तार को एर्थिग करना चाहिए। Please Subscribe my YouTube channel ⁸ साइट पर केबल ड्रम की अन-लोडिंग, स्टोरेज और हैंडलिंग के लिए दिशानिर्देश जो इस प्रकार की होनी चाहिए।  केबल ड्रम की अनलोडिंग या तो क्रेन द्वारा या होइस्ट द्वारा या ट्रक ...

Cable trench specification | Various type of cable trench

  Hello friends, I had told in my previous blogging that the current carrying capacity of different UG cables.Today I will tell you how the UG cable is laying and how the cable trench is done with the specification.   UG cable is very expensive, about 3-4 times expansive and also laying. But due to many reasons we have to do UG Cable. One of them is because of the reason   we have to do UG cable even after being so expensive, is density populated areas where Overhead Network cannot be used. However, the cable should be properly laid because it takes more time to find the fault than the overhead line.           Before selecting for laying UG cable, the current carrying capacity, voltage drop and short circuit current of the cable are very important factors which I had written earlier in blogging. Generally the life of the cable is 40-50 years. But Incorrect handling/laying can result in insulation damage and decreases...

concrete pole specification | how to calculate cement, sand and aggregate quantity in concrete

Today I will tell, how PCC pole concreting is done? Before knowing about our topic, let's take a little knowledge about PCC Polls.full form of pcc pole is Plain  Cement Concrete pole .There are various types of PCC Pole like 8 mtr 8.5 mtr ,9 mtr .but Now I will discuss about only 8.5 mtr pcc pole. As per Guaranteed Technical Perticulars(GTP) Total Length-8.5 mtr Pit depth-1.5 mtr Working load applied 300 mm from top-180 kg Weight of the pole-415 Kg. Top dimension-90mmx145 mm Bottom dimensions-90mm x 300 mm we have to maintain pit length is 1.5 mtr and pole should be inside pit is L/6 where L is length of the pole. Explained : L=8.5 mtr Pit depth=L/6+0.075(Base plate) Pit diameter =20 inch(0.508 mtr) Let's go to our topic now. How to calculate cement, sand and aggregate quantities for ratio 1:2:4 Pit Size For one cmt cement required -6 bag Our pit volume (dia-0.508 mtr where r-0.254, depth-1.5 mtr) Volume -pie*r2*h                =3.14*0.254*0...