Interview questions to ask

 Today I will share some interview asked question in RE or Distribution project  work.


1)Types of PCC Pole used?

Ans-Click here to know Answer.

2)Weight of 8.5 mtr PCC pole?

Ans-Click here to know Answer.

3) Weight mentioned on pole i.e 8.5 mtr 180kg.Which Waight is 180kg?

Ans-Click here to know Answer.

4)Full form of PCC Pole?

Ans-Click here to know Answer

5)How much Pit depth of a Pcc pole?

Ans-Click here to know Answer.

6) How to do PCC pole concreting?

Ans-Click here to know Answer.

7)Say types of Conductor used?

Ans-Click here to know Answer.

8) Current carrying Capacity of a Rabbit Conductor?

Ans-Click here to know Answer.

9)Weight of a Rabbit Conductor per KM?

Ans-Click here to know Answer.

10) Current carrying Capacity of HT ABC?

Ans-Click here to know Answer.

11) Current carrying Capacity of a XLPE Cable?

Ans-Click here to know Answer.

12)Say Size of a Rabbit Conductor in mm?

Ans-Click here to know Answer.

13)Prepare a single line diagram of a 3 phase Distribution transfermer structure?

Ans-


14)Why is semiconductor layer used in HT ABC?

Ans-Click here to know Answer.

15) Function of cupper screen in HT ABC?

Ans-Click here to know Answer.

16)Full form of RDSS?

Ans-Click here to know Answer.

17)Full form of PG Clamp.

Ans-Parallel Groove Clamp

18) Working load and weight of a Steel Tubular Pole (STP)?

Ans-Click here to know Answer.

19)How to remove fault in HT ABC?

Ans-Click here to know Answer.

20) How much minimum Phase to Phase distance should be maintained of a 11 KV line?

Ans-Minimum phase to phase distance should be maintained for 11 KV Line is 127 mm.

21)How much minimum phase to phase distance should be maintained for 33 KV line ?

Ans-355 mm

22)How much minimum phase to phase clearance should be maintained for LT Line?

Ans-19 mm

23) What is Creepage distance?

Ans-Click here

Creepage distance is the shortage distance along the surface of solid insulating material between two conducting part.

24)Make single line diagram of a 33/11KV PSS?

Ans-

25)How much current flows in a 25 KVA transfermer in the primary and secondary side?

Ans-Click here to know Answer.

26)How to improve Voltage Regulation in a distribution line?

Ans:Click here to know Answer.

27)Why does now 11 / 0.433 KV Distribution transformer  used in place of 11/0.4KV?

Ans-Click here to know Answer.

Note-Please follow my site for updating new questions in this blog.Also requesting all reader , If you guys know the answer, then please put it in the comment box or get information by clicking in the answer box.

28)Permissible Earth resistance of a 33/11 KV PSS?

Ans-Click here to know Answer.

29)Permissible Earth resistance of a Distribution transformer and electric pole?

Ans-Click here to know Answer.

30) Explain how to measure earth resistance of an electric pole Earthing?

Ans-Click here to know Answer.


31)Full form of GTP?

Ans-Guaranteed Technical Particular

32)Full form of RDSS?

Ans-Revamped Reforms -based and Results-linked ,Distribution Sector Scheme 

32)What is discharge rod?

Ans-Discharge Rods an insulated rods, usu
ally made of strong fiberglass tubes wi
th extension handles. Discharge Rod c
omplete with accessories is suitable in
11KV, 33KV, and 66KV system voltage
for discharging dead conductors /bus
bars.

33)How to do work in safely at site?

Ans-Make checklist to maintain safety during charging of line/Shut down work.
Site Engineer should confirmed the PSS and feeder of WIP location by visiting with line staff
of respective PSS.
Take properly shutdown in record by letter or signing in register and take picture.
Using discharge rod in all  phases at both side of the working location of workman and
connect properly with earthing.
Ensured duscharge rod should be used after taking shutdown... not used in live line.
Create safety zone by barrication so that public never comes there..
After work over and workman getting off the pole ,remove discharge rods.
Then return shutdown properly and keep record .

Following procedure to follow my blog.

  • Click on right side 3 line


  • Click on follow box











Comments

Popular posts from this blog

concrete pole specification | how to calculate cement, sand and aggregate quantity in concrete

Today I will tell, how PCC pole concreting is done? Before knowing about our topic, let's take a little knowledge about PCC Polls.full form of pcc pole is Plain  Cement Concrete pole .There are various types of PCC Pole like 8 mtr 8.5 mtr ,9 mtr .but Now I will discuss about only 8.5 mtr pcc pole. As per Guaranteed Technical Perticulars(GTP) Total Length-8.5 mtr Pit depth-1.5 mtr Working load applied 300 mm from top-180 kg Weight of the pole-415 Kg. Top dimension-90mmx145 mm Bottom dimensions-90mm x 300 mm we have to maintain pit length is 1.5 mtr and pole should be inside pit is L/6 where L is length of the pole. Explained : L=8.5 mtr Pit depth=L/6+0.075(Base plate) Pit diameter =20 inch(0.508 mtr) Let's go to our topic now. How to calculate cement, sand and aggregate quantities for ratio 1:2:4 Pit Size For one cmt cement required -6 bag Our pit volume (dia-0.508 mtr where r-0.254, depth-1.5 mtr) Volume -pie*r2*h                =3.14*0.254*0...

what are the possible causes of cable faults?

नमस्कार मित्रों,आज मैने HT AB CAble फॉल्ट कियुं होता है उसिके बारे में चर्चा करूंगा।    आप सभी जानते है कि एचटी एबीसी साइट इंजीनियर के लिए सरदर्दी बन जाती है। जैसे ही लाइन चार्ज करते है कुछ मिनटों या महीनों के बाद फॉल्ट आना पैदा करदेता है।   बहुत सारे इंजीनियर तो बोलना शुरू कर देते है कि खराब इनसुलेशन की बजहा से ऐसे फॉल्ट होता है।  बहुत सारे रिसर्च और अनुभव के बाद  बाद में यही नतीजे में पहुंचा कि जो इस्प्रकर की। 1) अन लोडिंग,स्टोरेज और हैंडलिंग सही से होना चाहिए। 2) टर्मिनेशन किट या ज्वाइंटिंग सही से होना चाहिए। 3) एआर्थिंग सही से होनी चाहिए जैसे कि टर्मिनल की latches  एआर्थिग  जरूर करना होता है। एक चीज ध्यान देना कि मैसेंजर तार को भी दोनों साइड में एर्थिंग करने की। ऐसे तो मैने ए भी कहूंगा कि  हर एक खंबे में मैसेंजर तार को एर्थिग करना चाहिए। Please Subscribe my YouTube channel ⁸ साइट पर केबल ड्रम की अन-लोडिंग, स्टोरेज और हैंडलिंग के लिए दिशानिर्देश जो इस प्रकार की होनी चाहिए।  केबल ड्रम की अनलोडिंग या तो क्रेन द्वारा या होइस्ट द्वारा या ट्रक ...

11KV ABC cable current carrying capacity

Let us discuss about Size and current carrying capacity of a  11 KV 3x120 mm2 AB Cable. Before getting answer we have to know about Technical Specification.The Technical Specification as below. TECHNICAL SPECIFICATION FOR 11KV AB Cable( AERIAL BUNCHED CABLES)  and XLPE insulated (CROSSED LINKED POLYETHYLENE DRY GAS CURED/WET CURED) FOR OVERHEAD LINES. 1. SCOPE  This specification covers requirements of XLPE insulated, 11 KV Aerial Bunched Cables for overhead lines. 2. COMPOSITION OF THE CABLE The composite cable shall comprise three single-core cables twisted around a bare aluminium alloy messenger wire, which will carry the weight of the cable. 3. RATED VOLTAGE The rated voltage of the cables shall be 6.35KV/11KV and the maximum operating voltage shall be 12 KV. 4. APPLICABLE STANDARDS Unless otherwise stipulated in this Specification, the following Standards shall be applicable: i) IS: 7098 (Part-II) - 1985 – Cross linked Polyethylene Insulated PVC Sheathed Cables ...